Certain jobs get put to the back of the queue, simply because they are either tiresome, or not overly urgent.
The pool gate was one such job. It started off as a piece of fencing which flew off the car roof-rack, had to be reassembled, then made to fit the hole left by the previous rotten one.
Since the above photo was taken it has been cut in two, had all its fittings attached, and given a really good coat of 'diesel oil' as a preservative. The top has also been rounded to give it a softer look.
Job done. What's next on the list?
0 Yorumlar